Regular passenger train service launched between India and Nepal connecting the birthplaces of Rama and Sita
Read more
The times of India
timesofindia.indiatimes.com

Regular passenger train service launched between India and Nepal connecting the birthplaces of Rama and Sita

India and Nepal are preparing to launch a direct railway connection linking Ayodhya and Janakpur. After a break exceeding two years, Indian Railways will begin operating a direct cross-border passenger train.

This route will connect Ayodhya, the birthplace of Lord Rama, with Janakpur, the birthplace of Mother Sita. This initiative will not only strengthen bilateral relations but also promote religious tourism, as both cities are revered by Hindus.

The train will be virtually inaugurated by Prime Minister Narendra Modi and his Nepali counterpart Balendra Shah on its first run, November 23rd (Sunday). According to a Ministry of Railways notification, the weekly train from Janakpur will depart every Saturday afternoon, and from Ayodhya—every Monday afternoon.

Previously, passengers from India had to travel to Jainagar station in Bihar via Indian Railways, after which they needed to go through customs control and transfer to Nepal Railways trains to reach Janakpur-Dham and Kurt in Nepal. However, in the case of the Ayodhya Kant-Janakpur-Dham train, passengers will be able to continue their journey on the same train after passing customs control, an official stated.

Similar stories

Mangaluru Central-Madgaon Vande Bharat Express ceases operations after three years due to low ridership
Read more
www.aajtak.in

Mangaluru Central-Madgaon Vande Bharat Express ceases operations after three years due to low ridership

The operation of the Mangaluru Central-Madgaon Vande Bharat express has concluded after three years of service. This train, which ran between Karnataka and Goa, made its final journey on November 14, 2026. The train with numbers 20646/645 departed last from Mangaluru and Madgaon. It has now been replaced by the new Yashwantpur-Mangaluru Junction-Madgaon Vande Bharat express, which began running on November 15.

The new rake will allow passengers to travel on the Vande Bharat from Bangalore to Goa. Initially, the Mangaluru Central-Madgaon Vande Bharat was launched on December 30, 2023. Prime Minister Narendra Modi gave the train the green light via video conference during the inauguration ceremony at Ayodhya Dham. It became the first Vande Bharat express to pass through coastal Karnataka.

Although no farewell event was organized at Mangaluru Central on the day of the last run, the Ministry of Railways decided to stop the old service following the launch of the new Yashwantpur-Mangaluru Junction-Madgaon Vande Bharat express. The new train has the number 26655/656. Prime Minister Narendra Modi inaugurated it on November 13 from Bangalore, while Railway Minister Ashwini Vaishnaw gave it the go-ahead from Mangaluru Junction.

A significant role in the launch of this train was played by Nalin Kumar Katil, then a Member of Parliament from the Bharatiya Janata Party (BJP) representing South Kannada. He advocated for the commencement of Vande Bharat service between Mangaluru and Goa to stimulate tourism in the region. Railway Minister Ashwini Vaishnaw approved this proposal. Initially, the train generated high hopes among passengers, but over time, it did not attract sufficient ridership.

For various reasons, the train's occupancy did not exceed 50 percent. Nevertheless, public organizations and local residents continued to insist on extending the route to Mumbai. They demanded that it be connected with the Mumbai CSMT-Madgaon Vande Bharat train, but this was not realized.

The Mangaluru Central-Madgaon Vande Bharat Express departed from Mangaluru at 8:30 AM and arrived in Madgaon at 1:15 PM, making stops at Udupi and Karwar. On the return journey, the train left Madgaon at 6:10 PM and arrived at Mangaluru Central at 10:45 PM. Passengers wished for the train to have 16 coaches instead of 8 and for it to be extended to Mumbai. However, these demands were not met due to low ridership.

Following improvements in railway connectivity between Mangaluru and Bangalore, the demand for launching a Vande Bharat on this route increased. In December 2025, the electrification of the Sakleshpur-Subrahmanya Road Ghat section of the Hassan-Mangaluru railway line was completed. After this, hopes grew for a direct Vande Bharat connection from Bangalore to Mangaluru and Goa.

Railway Minister Ashwini Vaishnaw announced on September 29, 2026, the extension of the old Mangaluru-Madgaon train to Yashwantpur. Subsequently, the decision was made to launch a new train on the Yashwantpur-Mangaluru Junction-Madgaon route. This train was launched on November 13 and will traverse a 55-kilometer stretch of the Western Ghats. Concurrently, he announced the development of Mangaluru Central station worth 940 million rupees.

Vande Bharat train will start running between Ayodhya and Janakpur from November 23
Read more
www.aajtak.in

Vande Bharat train will start running between Ayodhya and Janakpur from November 23

Significant steps have been taken to strengthen railway connectivity between India and Nepal. Indian Railways has approved a new weekly train service between Ayodhya in the state of Uttar Pradesh and Janakpur-Dham in Nepal. This train will connect Ayodhya, the birthplace of Lord Rama, with Janakpur-Dham, the birthplace of Mother Sita.

The route, spanning approximately 604 kilometers, will pass through many major cities in Uttar Pradesh and Bihar. According to the railway, this service will facilitate travel for pilgrims and tourists from both countries, as well as promote tourism between religious sites associated with Ramayana.

The train will depart from Ayodhya Cantt and head to Janakpur-Dham, making 10 commercial stops. Among these stations are Mankapur, Basti, Gorakhpur, Narkatiaganj, Raksaul, Sitamarhi, Shishau, Madhubani, and Jaiengar, as well as other stations.

According to information published by the railway, the train will first pass through Ayodhya, Mankapur, and Basti in Uttar Pradesh, reaching Gorakhpur. It will then enter Bihar and, after passing through several cities in Bihar, reach Janakpur-Dham in Nepal.

The new railway line will operate one day a week in both directions. From Ayodhya Cantt, the train will depart for Janakpur-Dham every Monday. The return journey from Janakpur-Dham to Ayodhya Cantt is scheduled for every Saturday. This will provide direct rail connectivity for people undertaking religious pilgrimages between Ayodhya and Janakpur, especially for pilgrims visiting holy sites associated with Ramayana.

The railway believes that this service will simplify cross-border travel between India and Nepal. Since Ayodhya and Janakpur-Dham are important religious and cultural centers, the launch of direct rail connectivity between them is expected to stimulate tourism related to the Ramayana route.

The benefits will not only accrue to pilgrims but also to those traveling for business, educational, or family reasons. Local businesses, including the hospitality sector, tourism services, and handicrafts in the border areas of Bihar and Nepal, will also benefit.

There are age-old cultural and social ties between India and Nepal. The peoples of both countries also share deep kinship based on religious traditions. This railway initiative is considered important for further strengthening relations between the two nations.

Vande Bharat Express to start service on Bangalore-Mangaluru route, reducing travel time to 7 hours
Read more
www.aajtak.in

Vande Bharat Express to start service on Bangalore-Mangaluru route, reducing travel time to 7 hours

Residents of Bangalore, the capital of Karnataka, and passengers traveling to the coast in Mangaluru have good news. Indian Railways plans to launch the Vande Bharat Express between these two cities starting November 13. This high-speed semi-train will allow travel from Bangalore to Mangaluru in approximately 7 hours. Previously, several express trains operated on this route, requiring 9 hours or even more to cover the distance. The launch of the new train is expected to provide faster rail connectivity for business travelers, tourists, and daily commuters.

According to available data, the proposed Vande Bharat Express will run between Yashvantpur station in Bangalore and Mangaluru Junction. Railway Minister Ashwini Vaishnaw had previously hinted at the imminent launch of the Vande Bharat train on this route. However, an official statement from the railway regarding the commencement date, final schedule, and stops is still awaited.

The Vande Bharat Express tested on the Bangalore-Mangaluru route in September showed impressive results. On September 10, the 16-coach train departed from Yashvantpur at 6:50 AM and arrived at Mangaluru Junction at 1:55 PM, completing the journey in approximately 7 hours and 5 minutes. The return journey from Mangaluru to Yashvantpur took about 6 hours and 49 minutes. These test results indicate that the new train can significantly save passenger time compared to existing express services.

Currently, many trains running between Bangalore and Mangaluru require a long time to complete the journey. For instance, the Bangalore-Kannur train to Mangaluru takes about 9 hours, while the Yashvantpur-Karwar train takes about 9 hours and 35 minutes. With the proposed Vande Bharat Express, however, this distance could be covered in approximately 7 hours, representing a potential time saving of two to two and a half hours for passengers.

The proposed Vande Bharat train will travel from Yashvantpur to Mangaluru Junction. During the trials, a stop was planned at four stations: Hassan, Sakleshpur, Subrahmanya Road, and Kabaka Puttur. However, the final decision on regular stops at these stations has not yet been made. The final route, schedule, and stopping points will only become clear after an official announcement by the railway.

Work on the electrification of the Bangalore-Mangaluru railway route was completed in December 2025. The project began in December 2023 and included the installation of overhead electrical equipment on the tracks, as well as the construction of switching stations. A test using an electric locomotive was conducted on this route on December 28, 2025. The completion of electrification opened the way for electric train movement on this route. Nevertheless, due to the hilly terrain of the Western Ghats, especially on the Sakleshpur section with descents and winding tracks, speed restrictions will apply to train movement.

The Vande Bharat Express is designed with the needs of passengers for fast and comfortable travel in mind and is equipped with a range of modern amenities. Vande Bharat trains are capable of reaching speeds of up to 160 kilometers per hour on suitable railway lines. However, the actual speed on the Bangalore-Mangaluru route will depend on the condition of the tracks, the mountainous terrain, curves, and operational restrictions of the railway. Passengers should await an official announcement for now. If the service starts on November 13, rail connectivity between Bangalore and coastal Karnataka could become faster and more convenient than before.

Popular