The Tashkent Metro has appealed to passengers to distribute themselves more evenly across carriages and, if possible, choose stations with lower attendance. This appeal is due to the increased overall load on the metro system.
The following options are suggested as alternatives to reduce passenger flow. Instead of Chilanzar station, which serves 60–65 thousand people daily, passengers are recommended to use Mirzo Ulugbek station, where the daily traffic is 20–25 thousand people. Similarly, instead of Halklar Dostligi station, which takes in 35–40 thousand people per day, one can choose Milli Bog station with a figure of 6–8 thousand passengers.
Furthermore, the metro asks passengers to try to board newer trains, use not only the first but also the middle carriages, and to let exiting people pass and approach the doors in advance before arriving at their stop.
According to information from the metro, the total number of underground users reached 61.7 million in September and October 2026, which is 20% higher than the figures for the same period last year. Currently, the metro transports over 1.2 million passengers daily.
It is planned that in 2027, the Tashkent Metro will acquire an additional 14 modern five-car trains. This will ensure further rolling stock renewal and increase the total number of trains operating on the lines.

