Following the launch of the first mobile dispatch center in the Khorasan Razavi province, the Energy Minister issued an order mandating the implementation of this model nationwide. The Deputy for Electricity and Energy has been tasked with developing the necessary directives to execute this plan.
According to Mehr News Agency, citing the Ministry of Energy's information portal, Abbas Aliyabadi instructed the expansion of this model across the entire country during his visit to the first mobile dispatch center in Khorasan Razavi. He also appointed Mostafa Rajabi Mashhadi, the Deputy for Electricity and Energy of the Ministry of Energy, to be responsible for its implementation.
This center was designed and built to ensure monitoring and management of the energy system during emergencies and in locations where access to stationary dispatch centers is difficult.
The report states that the country's first mobile dispatch system was developed and constructed by experts from the Khorasan Regional Electric Company and possesses the capability for rapid deployment and online network monitoring. In its initial operational activity, the system established a connection with the National Dispatch Center.
During his visit, the Energy Minister emphasized the importance of applying new technologies for managing emergency conditions in the grid and asked the Deputy for Electricity and Energy to prepare the framework for spreading this model to other regional electric companies by drafting the required directives.
Mostafa Rajabi Mashhadi, the Deputy for Electricity and Energy of the Ministry of Energy, also discussed the capabilities of this system, noting that mobile dispatching allows for real-time network control and issuing maneuvering commands independent of fixed nodes.
He added that by utilizing this technology, operational control and management can be carried out at various points in the network, reducing limitations caused by the geographical location of permanent centers.
Rajabi Mashhadi specified that, in accordance with the Energy Minister's order, the necessary instructions will be issued to disseminate this model to regional electric companies so that this function can be used to enhance the resilience of the energy system during emergencies.
Thanks to its secure and independent communication infrastructure, this center can be placed in critical points of the network and manage energy system stabilization operations.
